Have you constructed a new building or your old electricity meter is damaged? There may be other reasons. Want to apply for FESCO new connection or new meter but the problem is that you do not know how to apply for a new connection. So don’t worry because I am here to help you.

Now FESCO provides an online portal through which you can apply for a new connection. The Procedure of applying for a new connection is very easy. Simply follow the steps given below to apply for a new connection.

FESCO NEW CONNECTION
FESCO NEW CONNECTION

Documents Need for a New Connection?

The FESCO new meter/connection you need following things

  • Name
  • Address
  • Contact Information
  • Any neighbor or family member bill near to your house
  • Property /land documents
  • Load demand assessment form
  • You will also need to attach a copy of your CNIC (Computerized National Identity Card)

How to Get FESCO Online Demand Notice?

Once you have requested a reconnection FESCO will issue a demand notice after verifying your reconnection request. Normally FESCO charges Rs.9800 for installation which includes a 3KW connection guarantee but you have to pay some extra charges as well depends on area. If you download or print your FESCO demand notice using your tracking id on the button below (ENC Website), you will see all the details on the ENC Portal. You can find out from this link ENC

Online Application Process

Applying for a new connection online is much easier compared to the offline process. You can follow the below steps to apply for electricity connection online , Visit the official ENC website.

  • Visit the official ENC website.
  • Click “Apply”.
  • Put all the information in the application form and attach all the required documents.
  • Fill in all the relevant details and submit the form.
  • Keep the receipt safe.
  • Once the application is submitted, it will take care of the relevant field team.
  • Payment is due upon completion of the inspection.
  • After final verification, wait for the team to install and activate the new meter.

Estimated Time For New Connection

Based on the load required for the new combination, WAPDA developed four different grade bands. The following is a description of the steps and time for each class.

Category One Connection Process for Loads of 15kW or Less

  1. Application Receipt: After applying, you’ll receive a receipt with a queue number to track your application status. (1 Day)
  2. Site Survey: The team will inspect the location to determine if a new meter can be installed. (3 Days)
  3. Cost Calculation: If installation is possible, the total cost for the meter installation will be calculated. (2 Days)
  4. Demand Notice: You will receive a demand notice by post or in person. (2 Days)
  5. Payment Submission: Submit the receipt for the paid demand note to the office. (2 Days)
  6. Test Report: Provide the wiring contractor’s test report for verification. (3 Days)
  7. Queue Position: The office will give you a queue position for installation based on payment date. (1 Day)
  8. Order Allotment: The department will allocate orders for installation. (3 Days)
  9. Equipment Offer: The department will contact the relevant office to supply the required equipment. (3 Days)
  10. Equipment Provision: The department store will provide the necessary equipment. (5 Days)
  11. Connection Setup: The SDO or Assistant Manager will arrange for the installation team to connect the new meter once the equipment is available. (5 Days)
FESCO NEW CONNECTION
FESCO NEW CONNECTION

New Connection Charges

Lump Sum Charges for New General Connections under Tariff A1 and A2

Single Phase Meter

Sr. No.DescriptionCost
1Length of service line up to 20 meters.Rs. 8,500/-
2Length of service line above 20 and up to 30 meters.Rs. 10,500/-
3Length of service line above 30 and up to 40 meters.Rs. 11,500/-
4Length of service line above 40 meters and up to and including 100 meters with one span LT with Ant Conductor and one Pole (excluding connections under Housing Societies).Rs. 11,000 + Rs. 800 per meter above 40 meters
5Length of service line above 100 meters and up to and including 160 meters with two span LT with Ant Conductor and two Poles (excluding connections under Housing Societies).Rs. 60,000 + Rs. 1,000 per meter above 100 meters
FESCO NEW CONNECTION CHARGES

Three Phase Meter

Sr. No.DescriptionCost
1Service line up to 20 meters.Rs. 36,500/-
2Service line up to 30 meters.Rs. 43,000/-
3Service line up to 40 meters.Rs. 50,000/-
WAPDA NEW CONNECTION CHARGES

Lump Sum Charges

These are ESTIMATED charges that can vary based on area and applicable taxes.

Conclusion

Sometimes finding new combinations can be a hectic process. However, WAPDA has ensured that customers can complete this process without any hassle by providing online and offline application facility. Once you successfully got your meter you can check your FESCO online Bill from here. Additionally, we have done our best to ensure that customers follow the process through our comprehensive guidance on new application process integration. If you have any questions about the service, do not hesitate to contact the relevant office.

FAQs

What should I do if the connection is not delivered within the specified time?

If your new WAPDA connection is not set up within the allotted time, you can complain. The relevant office will ask, and if the timeline is not followed, you should be charged.

Who pays for transformer installation?

For domestic connections, if a new transformer is required the company bears the installation costs. However the user bears the costs of technology and commercial integration.

Is it possible to upgrade the load/tariff of the connection?

Yes, you can upgrade your connection to a higher load. To do so, complete and submit the application form, along with the required upgrade fee.

How can I find Duplicate online bill?

Yes you can find the duplicate bill from our website and got it right away free of cost!